뒤로가기(학습창 닫기)
1챕터
건설업 감사 시 고려할 주요 회계 이슈 및 관련 감사절차 - 4
학습목차
Play Video
Play
Mute
Current Time
0:00
/
Duration Time
0:00
Loaded
: 0%
Progress
: 0%
Stream Type
LIVE
Remaining Time
-0:00
2배속
1.5배속
1배속
, selected
Playback Rate
1배속
Chapters
Chapters
descriptions off
, selected
Descriptions
subtitles off
, selected
Subtitles
captions settings
, opens captions settings dialog
captions off
, selected
Captions
Audio Track
Fullscreen
This is a modal window.
The media could not be loaded, either because the server or network failed or because the format is not supported.
Caption Settings Dialog
Beginning of dialog window. Escape will cancel and close the window.
Text
Color
White
Black
Red
Green
Blue
Yellow
Magenta
Cyan
Transparency
Opaque
Semi-Transparent
Background
Color
Black
White
Red
Green
Blue
Yellow
Magenta
Cyan
Transparency
Opaque
Semi-Transparent
Transparent
Window
Color
Black
White
Red
Green
Blue
Yellow
Magenta
Cyan
Transparency
Transparent
Semi-Transparent
Opaque
Font Size
50%
75%
100%
125%
150%
175%
200%
300%
400%
Text Edge Style
None
Raised
Depressed
Uniform
Dropshadow
Font Family
Proportional Sans-Serif
Monospace Sans-Serif
Proportional Serif
Monospace Serif
Casual
Script
Small Caps
Defaults
Done
건설업 감사 시 고려할 주요 회계 이슈 및 관련 감사절차 4차시
학습목차
3. 건설업 주요 감사절차
3.9 공사진행률과 타 진행률의 비교를 통한 공사진행률(및 공사수익)의 적정성 검토
3.10 공사계약수익(계약금액) 검토 기본절차(예시: 플랜트 EPC)
3.11 공사지연 등으로 인한 LD(Liquidated Damage) 완전성 검증(24년말 감사기준)
3.12 건설계약 주석 확인을 통한 LD 완전성 이슈 검토(23년말 기준)
3.13 주택 현장 관련 주요 자산의 손상가능성 검토
4. 건설업 주요 감리지적사례
4.1 예정원가 오류로 인한 매출원가 과소계상(2020년)
4.2 공사진행률 산정오류(2017년)
4.3 공사수익 오류(2016년)
4.4 공사수익 과대계상(2016년)
End